Service
Commercial Charging in Newcastle
Multi-bay installations with metering, access control and billing for workplaces, apartment buildings and fleet depots.
- Licensed NSW Electrical Contractor
- AS/NZS 3000 Compliant
- Certificate of Testing
- Fixed Price Quotes
- Newcastle Based
- Clean, Tidy Installations

Why homeowners choose it
Built around how you actually charge
Cost recovery
Energy is billed to the driver or tenant, not absorbed by the building.
Scales without rework
Infrastructure is sized for the end state from the start.
Supply-safe
Group load management keeps the site within capacity regardless of demand.
Auditable
Per-user session data supports reporting and reimbursement.
What's included
Everything in the fixed price
- Site capacity and load study
- OCPP-capable hardware
- RFID or app-based access control
- Metering and billing configuration
- Static and dynamic load management
- Containment, bollards and signage
- Commissioning and as-built handover
Installation process
- 01
Feasibility
Existing supply and cable pathways are assessed before hardware is chosen.
- 02
Design
Bay layout, expansion plan and access model are documented for approval.
- 03
Install
Infrastructure is sized for the end state, even if staged.
- 04
Commission and train
Back-office setup, tariffs and onboarding are completed.
Typical Newcastle setups
Common property patterns we plan for
Illustrative photos of the install styles described above — stock imagery, not verified job photos.






Typical scenarios
Common Newcastle property patterns
Coastal apartment building
Shared infrastructure with individual metering per lot, so energy is billed to the resident rather than the owners corporation.
Merewether or Warners Bay office car park
Staff charging across a bank of bays with RFID access and reporting for reimbursement.
Accommodation and short-stay properties
Guest charging with access control and per-session billing, common in Newcastle East and Hamilton.
Fleet or trades depot
Overnight charging staggered under group load management so the site stays within its supply.
FAQs
Commercial Charging questions
Can this be installed in a strata building?
Yes — owners corporation approval is usually the longest step, and we provide the documentation the committee needs.
Do we need DC fast charging?
Rarely. Where vehicles are parked for hours, managed AC charging costs far less to install and run.
How do we charge users?
Through an OCPP back-office platform that bills by RFID card or app account.
Is there government funding for this in NSW?
Incentives change, and support has more often targeted public, strata or fleet charging than individual homes. We do not quote figures — check nsw.gov.au and energy.gov.au for the current position before relying on any amount.

Get a fixed price for your install.
Tell us your car and where you park.
- Fixed-price quotes
- Licensed New South Wales electricians
- Installed to AS/NZS 3000
- Same-day quote turnaround
